2011
- Details
On 21 December 2011 the ring road of Kock and Wola Strogomska was opened. In the course of the new road S-19, the bridge MS-5 over the Wieprz river was constructed, in construction of which the company Mostostal Puławy S.A. participated. The bridge of 220 meters was constructed within the project: “The construction of the express road S19, a section Międzyrzec Podlaski-Lubartów, the construction of the ring road of Kock and Wola Skromowska of 7.87 km length, from km 257+500 to 265+215.” The investor of this enterprise was the General Directorate of Domestic Roads and Motorways [GDDKiA], the Division in Lublin.
- Details
On Saturday, 10 December 2011 Mostostal Puławy carried out a successful water test of a steam-raising boiler equipped with a grate furnace fired with wood (OSr – 32 type) in the city of Goch in Germany.
- Details
On Thursday, 1 December 2011 Mostostal Puławy successfully carried out a pressure test of a soda recovery boiler at the construction site in the paper plant in the city of Iggesund in Sweden.
- Details
Mostostal Puławy S.A. received an order from the Power Plant “Kozienice” S.A. for execution of the project “Reconstruction of the pipe bridge for hydraulic transport of ash and slag as well as return water pipelines from the storage site” under the investment project I9040N0015, acting as a General Contractor.
In scope of the project in question our company is to relocate the pipe bridges of the hydraulic transport system for ash and slag as well as return water pipelines.
- Details
At the end of November Mostostal Pulawy SA began a contract for a French company in the new European market. It relates to an installation of a boiler fired with municipal waste in Estonia. The scope of works includes installation of the boiler pressure part including pipelines, furnace grate and air ducts.
Total weight of the assembled components will be 1438 tons.