On the 6th and 7th September 2012, loading trials of bridge sites have been performed at the construction site of the eastern ring road of the city of Przemyśl, connecting national road No 77 with national road No 28. Conducted trials confirmed that actual bending of the bridges is equal to calculated values.
Load tests of a bridge in Przemyśl
- Details